Thursday, October 16, 2008

Crash and Burn









The blog might not get updated in the next week or so, my camera has crashed and Ashford has locked me out of the house. I asked for a key to get in or out of the house and they said I would get a key at closing, which hurt my feelings. Anyway, I'll see if I can't resurrect an old camera and get some photos up.

Basically the trim carpenter is on site setting cabinets, doors, and moulding everywhere. AC unit has been set, power has been terminated at the street so things are moving right along.

Monday, October 13, 2008

Rough Grading







They did some rough grading around the house and I paid their contractor to clear out some space behind the house to add to our back-yard, still not happy with the final elevations around the house, but the new back-yard is pretty good

Friday, October 10, 2008

Some More Photos



A better picture of the bathroom tile....

























I really don't like the new entry into the house but not much we can do, will just have to wait and see what the excavator can do for final grading.

Wednesday, October 8, 2008

Finishes Have Started






We actually started the final stages on the house, first coat of paint has been applied, and flooring has started plus we have a driveway and front walkway!!

Friday, October 3, 2008

Inside Ready For Paint








Just some pictures of the inside from last night

Thursday, October 2, 2008

Moving Forward




Not really much to report, things are moving along, drywall is just about done, they are sanding today and tomorrow, just trying to catch up on loose ends, should see flooring and such the next couple of weeks.

Saturday, September 27, 2008

End in Sight








Things are starting to come together, inside the house they are begining to finish the drywall, the brick is done (although the vent above the garage needs to be moved about 10' lower than it is). Outside, they should start working on final grade next week.